咨询热线 13332997463 | 0755-33151996

20201675

专题片网上配音

时间:2019-10-26 点击:849次

摘要
   武船管加项目视频说明文档   1. 解说词    序号 篇章 解说词    1 The “Thirteenth Five Year Plan” is a key period for China to make a powerful shipbuilding    基础篇 country,a

   武船管加项目视频说明文档

  1. 解说词

   序号 篇章 解说词

   1 The “Thirteenth Five Year Plan” is a key period for China to make a powerful shipbuilding

   基础篇 country,a large number of famous shipbuilding enterprises have started intelligent manufacturing

   (93 字) technology application. In order to meet the demand of market and capacity, a smart pipe

   processing workshop with annual capacity of 300,000 pipe fittings can be built.

   2 Smart pipe processing workshop will plan and design a panoramic digitalized workshop

   整体架构篇

   model through 3D workshop planning and logistics simulation , and set up five completely

   (151 字) automated production lines for big pipe, medium pipe, small pipe, special pipe, and straight pipe

   with advanced equipment ,兰州配音兰州配音and integrate PLM system, EISE system , and BCS system; Finally

   it will demonstrate a digitalized pipe processing workshop from multiple dimensions featuring

   manufacturing process fully under control.

  3 The information construction of the smart pipe processing workshop will get through

   生产过程全 information flow of links concerning design, plan, and manufacturing, and realize transmitting 3D

   掌控 design model of pipe fittings, processing technology as well as technological parameter data to

   (161 字) workplace and equipment.Equipment status, production process and product status can be gathered

   automatically, which make the production process effective, transparent and controllable.

  4 The first fully automated production line for straight pipe with medium and small diameters

   高效柔性生

   can be set up in the industry.It will include the following functional units: BCS, stereoscopic

   产

   storing, automated cutting, automated labeling, assembly welding, and automated logistics etc.

   (541 字) BCS system can receive information from EISE system , and send production instructions to

   the automated master control unit in sequence.

   With the automated stereoscopic warehouse, the stereoscopic storing unit can make

   automated storing and taking of pipe available.

   .The automated cutting unit will through a bus controlled system which can sent processing

   instructions to realize auto pipe taking, auto cycle machining and auto exiting.

   The automated labeling unit will use EO switch sensing and detecting pipe section entering

   the auto labeling machine. And the logistics system will automatically adjust labeling speed to

   realize fully automated labeling.

   With robotics vision measurement technology and welding seam tracking technology, the

   assembly welding unit can realize simultaneous welding with several robotics.

   The automated logistics unit runs through the whole pipe processing production line,which

   can realize auto transfer of pipe section in workplaces.

  5 虚实结合的 Construct a management control center with centralized control and dynamic demonstration

   管控中心 function which can, display in real-time production plan,production schedule and equipment

   operation status information.And finally it will construct an intelligent and comprehensive

   (182 字)

   management control platform which is virtual-real integrated and responsive.

  6 With organic combination of information technology and modern manufacturing technology,

   the smart pipe processing workshop will take intelligent manufacturing as its core, and build a

   总结篇 world’s top, domestic leading, and virtual-real integrated digital workshop .

   (258 字) Under the guidance of maritime power strategy and “Made in China 2025” plan, JARI will

   practice “Intelligent Shipbuilding” philosophy,and expect to turn over a new leaf in shipbuilding

   industry.

专题片网上配音

专题片网上配音

-->
请您留言

感谢您的关注,当前客服人员不在线,请填写一下您的信息,我们会尽快和您联系。

提交